facebooktwittertelegramwhatsapp
copy short urlprintemail
+ A
A -
webmaster

QNA
Doha
The Public Works Authority (Ashghal) will implement a temporary road closure on part of Al Beday Street between Bin Zaben Intersection and Al Lebdaya Roundabout.
The proposed road closure is required to complete the utility works and the construction of two underpasses at Bin Zaben Intersection as part of phase two of the Al Rayyan Road Upgrade project.
The diversion, which has been designed in coordination with the General Directorate of Traffic, will be implemented on July 14, 2017 and will last for three months.
For the convenience of road users travelling in the area, Ashghal has constructed a temporary road 200 metres to the east of Al Beday Street. The road consists of two lanes in each direction and will be connected with Al Rayyan Al Qadeem Street by a new traffic signal junction which has been constructed to the east of Al Lebdaya Roundabout.
Road users who usually use Al Beday Street to travel between Bin Zaben Intersection and Al Lebdaya Roundabout will be required to use the new temporary road and then use the new traffic signal junction at Al Rayyan Al Qadeem Street or Bin Zaben Intersection to continue on their journey.
The Public Works Authority will install road signs to guide motorists of the closure.
Ashghal has requested all road users to abide by the speed limit, which has been reduced to 50 kph, to ensure the safety of road users and project workers.
copy short url   Copy
13/07/2017
582