facebooktwittertelegramwhatsapp
copy short urlprintemail
+ A
A -
webmaster
tribune news network
doha
THE Public Works Authority ‘Ashghal’ has announced the commencement of installing a steel structure pedestrian bridge on Doha Expressway (Al Amir Street) between New Al Mirqab Street and Talha bin Khalid Street at Nasser Bin Salmeen Al Suwaidi Intersection as part of Qatar’s plan to build pedestrian bridges to enhance traffic safety throughout the country.
The construction of the pedestrian bridge aims to enable residents and visitors of the area to pass through Doha Expressway, reaching commercial facilities, and reduce accidents that pedestrians may be exposed to, especially since the bridge is located in a vital area that witnesses traffic congestion throughout the day, in addition to facilitating connectivity between the people of Al Mirqab and Al Sudan.
This bridge, which is 62.40 metres long and 4.30 metres wide, is equipped with elevators on both sides that can accommodate a large number of users, including those with special needs, and is equipped with lighting systems, surveillance cameras, protection and firefighting systems and a system for counting the number of bridge users.
It is noteworthy that Ashghal continues to implement the construction of the pedestrian bridge in cooperation with the other entities. It seeks to complete the mechanical and engineering works as per scheduled so that the bridge is open by the end of 2020.
In order to facilitate the works, Ashghal will implement a temporary closure on Doha Expressway and traffic will be closed in both directions, as the main road will be closed for a distance of about 3.2 km from Al Rayyan Interchange to Nasser Bin Salmeen Al Suwaidi Intersection tunnel while keeping traffic on the service road open as well as the traffic signal.
Traffic will also be closed on the service road from Nasser Bin Salmeen Al Suwaidi Intersection to Doha, as well as from Doha towards Nasser Bin Salmeen Al Suwaidi Intersection.
During the closure, road users coming from Al Shamal to Doha via the Doha Expressway can go through the service road after Al Rayyan Interchange to reach Nasser Bin Salmeen Al Suwaidi Intersection, then turn right onto Al Waab Street to reach Al Waab Roundabout and return through the roundabout towards Ahmed Bin Taymiya Street, and then turn south towards Talha bin Khaled Street and Al Mashaf Street, and back south to the Doha Expressway, reaching their various destinations.
On the other hand, commuters heading north from Doha via Doha Expressway must turn right towards New Al Mirqab Street and turn left towards Mohammed Bin Al Qasim Street to Al Sadd Street, then turn right to Joaan Street and then turn left at the Olympic Intersection and return to Doha Expressway and continue north on their way to their various destinations.
The Public Works Authority will install sufficient road signage to alert road users with this diversion. In order to ensure safety, commuters need to abide by the speed limit and follow the road signage.
copy short url   Copy
13/08/2020
699