facebooktwittertelegramwhatsapp
copy short urlprintemail
+ A
A -
webmaster

Tribune News Network
Doha
The Public Works Authority (Ashghal) will implement a temporary partial closure on Al Furousiya Roundabout (Equestrian R/A) for a period of three days from evening of Thursday, April 26 until evening of Sunday, April 29, 2018, in coordination with the General Directorate of Traffic.
During the closure period, traffic heading from Umm Al Jamajim Street and Al Qalaa Street to Al Furousiya Roundabout can only turn right into Al Furousiya Street, while traffic heading from Al Furousiya Street to the roundabout can continue straight on Al Furousiya Street or turn right.
The closure will facilitate construction works to convert Al Furousiya Roundabout into a signal-controlled intersection as part of Al Furousiya Street Development Project.
The project includes converting Al Furousiya and Muaither roundabouts into signal-controlled intersections to ease traffic congestion in the area, in addition to increasing the number of lanes of Al Furousiya Street to four lanes in each direction with a service road on both sides of the street, in order to enhance traffic flow and increase the street capacity to accommodate current and future traffic requirements.
The Public Works Authority will instal road signs to guide motorists about the closure.
Ashghal has requested all road users to abide by the speed limit and follow the road signs to ensure their safety.
copy short url   Copy
26/04/2018
648