Qatar Tribune
First Page Gulf / Middle East World
United States South Asia India
Europe Pakistan  
  
United Kingdom Philippines /SE Asia  
Home About Us Advertising Archives Subscribe Site Map Contact Us
 
 
Wednesday, June 19 2013
The Road To Democracy
EVER since their ice-breaking meeting last year, President Thein Sein and Daw Aung San Suu Kyi have shown uncommon courage and pragmatism as they have moved cautiously, but in step, to reorient public attitudes and transform the political climate.
THE CREATIVE MONOPOLY
AS a young man, Peter Thiel competed to get into Stanford. Then he competed to get into Stanford Law School. Then he competed to become a clerk for a federal judge. Thiel won all those competitions. But then he competed to get a Supreme Court clerkship ...
Al Watan - Arabic Newspaper
Jamila - Monthly Women Magazine
Nation Business Sports Chill Out
Japan N-plant atop active geological fault: NISA

REUTERS

TOKYO A NUCLEAR plant in northwestern Japan may be sitting right on top of an active geological fault, the country’s nuclear watchdog has said, raising the risk that the facility may never resume power generation for fear of an earthquake.

For the first time in more than 40 years, Japan faces the prospect of having no nuclear power within weeks, after last year’s crisis at the Fukushima Daiichi nuclear plant crushed public trust in nuclear power and prevented the restart of reactors shut for regular maintenance checks.

The fault fracture zone under the No 1 and No 2 units of the 1,517-megawatt Tsuruga plant could be an active fault that could move jointly with a confirmed nearby active fault, the Nuclear and Industrial Safety Agency (NISA) found in a site survey on Tuesday, a spokesman for the plant’s operator said.

The operator, unlisted Japan Atomic Power Co, denies the existence of an active fault right under the plant, citing its geological assessment, but the NISA has ordered an additional investigation following its findings, the spokesman said.

Nuclear power, long advertised as safe and cheap, provided almost 30 percent of Japan’s electricity before the crisis, but now all but one of Japan’s 54 reactors are offline, mainly for maintenance.

The last reactor will shut down on May 5
Japan has rules against installing a nuclear plant on top of an active fault that has moved within the last 120,000 to 130,000 years, and the Tsuruga site could be declared unfit to host a nuclear plant.

The plant’s 357-MW No.1 unit and the 1,160-MW No.2 unit have been shut since last year for planned maintenance.

Japan Atomic Power had previously aimed to add No.3 and No 4 units at the plant, with capacity of 1,538 MW each, by 2018, but the plan has stalled, reflecting public worries over nuclear power after the Fukushima plant was wrecked in the March 2011 earthquake and tsunami, triggering radiation leaks that caused mass evacuations and widespread contamination.

The restart of the No 1 unit, which began operation in 1970, has been uncertain in light of Japan’s plans to limit the life of reactors to 40 years, and permit extensions only under stringent terms.


Thousands rally to oppose US-Japan trade talks
N Korea marks army day, vows war against South
Son of ousted China leader speaks out
Shun talk shows, Russian priests asked
Greek families forage abroad to stay afloat
Al Jazeera may edge BSkyB for EPL TV rights
Costly oil fuels global food price rise
Fed avoids new stimulus, sees US economy growing
Abbas backs Arabs’ visit to Jerusalem
Class catches Cameron, foes scent blood

  About Us Advertising Subscribe Careers Contact Us